Bouldercombe

operating
QLD 2023
Total Capacity 50MW
Storage 100MWh
2 — 5 Aug
Total Energy --
Capacity Factor --
Net Revenue --
Storage Duration 2 h
Round-trip Efficiency -- Requires interval data

Generation

30 min
Power
MW

Market

About

The Bouldercombe Battery Project (BBP) located in Rockhampton, is now operational and is Genex’s first large-scale battery energy storage project of 50MW/100MWh’s.

Genex has signed a Connection Agreement with Powerlink enabling BBP to connect into the adjacent 275kV/132kV Bouldercombe substation, via an exiting 132kV bay. BBP is located at critical part of the Queensland electricity grid with high network strength and Marginal Loss Factors.

BBP is built using the Tesla Megapack 2.0 hardware and will operate under the Tesla Autobidder software.

Units

1 unit