Bungama
operating SA South Australia 2025
Total Capacity 150MW
Storage 300MWh
2 — 5 Aug
Total Energy --
Capacity Factor --
Net Revenue --
Storage Duration 2 h
Round-trip Efficiency -- Requires interval data
Generation
30 minPower
MWMarket
About
The Bungama BESS is designed to integrate into the National Electricity Market through a 275 kV connection to ElectraNet’s Bungama Substation. Through grid connection, the Project will contribute to a more reliable and stable network for South Australia, by storing excess energy until it is needed. The project is being designed for an operational life of up to 25 years.