Broadwater
commissioning NSW New South Wales 2008
Total Capacity 38MW
2 — 5 Aug
Total Energy --
Capacity Factor --
Revenue --
Avg Price Received --
Generation
30 minPower
MWMarket
Emissions
About
Commissioned in 2008, Cape Byron is one of the largest base load generators of renewable power in Australia. Cape Byron Management purchased the Broadwater and Condong power stations in November 2013 and has continued to implement a range of efficiency, reliability and environmental improvements. Since taking over the power stations annual renewable energy generation has increased by more than 20% at both Broadwater and Condong.
The 38MW biomass power station at Broadwater produces clean, renewable electricity from mostly sugar cane milling waste, along with certain types of wood residues and energy crops, commonly referred to as ‘biomass’ fuel.
Owner
Units
1
unit
Broadwater
NPI Pollution Data
No pollution data available for this facility.