Koorangie

operating
VIC 2025
Total Capacity 185MW
Storage 370MWh
2 — 5 Aug
Total Energy --
Capacity Factor --
Net Revenue --
Storage Duration 2 h
Round-trip Efficiency -- Requires interval data

Generation

30 min
Power
MW

Market

About

Currently in the development phase, the new lithium-ion battery will be connected to AusNet’s 220kV transmission network and provide system strength to the Murray River Renewable Energy Zone (REZ).

Edify has been awarded a System Support Agreement with the Australian Energy Market Operator (AEMO) to provide 125 megawatts (MW) of services to strengthen the power system and increase the potential for generation in the Murray River region. The objective for KESS is to increase the renewable hosting capacity of the Murray River REZ by up to 300MW, through the provision of system strength to improve network stability.

Units

1 unit

Facility photo