Supernode

operating
QLD 2025
Total Capacity 260MW
Storage 545MWh
2 — 5 Aug
Total Energy --
Capacity Factor --
Net Revenue --
Storage Duration 2.1 h
Round-trip Efficiency -- Requires interval data

Generation

30 min
Power
MW

Market

About

The South Pine switchyard is the central node of the Queensland electricity transmission network, 80% of Queensland’s total electricity flows through this ‘supernode’ on a daily basis. Quinbrook’s Supernode Data Centre and Battery Energy Storage Site (‘BESS’) site, located adjacent to the South Pine switchyard, will host one of the largest battery storage installations in the Australian National Electricity Market. The 750 MW (2 – 4 Hour) BESS offers large power users an innovative solution to obtain stable power supply and overcome the critical stability issues facing the Queensland power grid as recently identified by AEMO.

Owner

Units

1 unit

Photo of Supernode

Supernode BESS