Uranquinty

operating
NSW 2008
Total Capacity 692MW
2 — 5 Aug
Total Energy --
Capacity Factor --
CO₂ Emissions -- No emissions data
Emissions Intensity --
Revenue --
Avg Price Received --
Running Hours -- Requires interval data

Generation

30 min
Power
MW

Market

Emissions

About

The Uranquinty Power Station is a 640-megawatt (860,000 hp) natural gas-fired power station located in Uranquinty, New South Wales, Australia, comprising four Siemens V94.2 gas turbines. It is the second largest gas-fired power station in New South Wales, and is used during peak loads.
Uranquinty Power Station was the fourth power station to be constructed by NewGen Power which was jointly owned by ERM Power and Babcock and Brown Power at a cost of $500 million.On 4 July 2008 Babcock and Brown Power announced that it had sold the Uranquinty power station for $700 million to Origin Energy.On 19 January 2009 Origin Energy Limited announced that the Uranquinty Power Station was commissioned with eight people employed to operate the facility.

Units

4 units

Photo of Uranquinty

Uranquinty